Alwasel, A, Abdel-Rahman, E M, Haas, C T and Lee, S (2017) Experience, Productivity, and Musculoskeletal Injury among Masonry Workers. Journal of Construction Engineering and Management, 143(06).

Borges, W F and Mário, P d C (2017) Five Project-Duration Control Methods in Time Units: Case Study of a Linearly Distributed Planned Value. Journal of Construction Engineering and Management, 143(06).

  • Type: Journal Article
  • Keywords: Project management; Time variance; Schedule variance; Cost variance; Construction project; Cost and schedule;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0001280
  • Abstract:
    Changes in projects often affect planned performance. Earned value management (EVM) is a performance measurement methodology to control costs and scheduling by evaluating project progress using monetary values. Complementary methods to control project duration in time units were developed. This study contributes to project management by showing how to control costs, schedules, and time variances, given changes in quantity, resource costs, and productivity to identify the responsibilities of a contractor and owner for variations in time and cost. This study addresses the main methods for controlling project time variance in time units, as obtained through an extended literature review, and utilizes these methods by applying data from a real-life project. The findings indicated that in the case of a linear distribution of planned values, four of the five methods yielded identical values for the time variance to date and one of the methods depends more on the number of parallel activities in progress or completed.

Chang, R, Zuo, J, Soebarto, V, Zhao, Z, Zillante, G and Gan, X (2017) Discovering the Transition Pathways toward Sustainability for Construction Enterprises: Importance-Performance Analysis. Journal of Construction Engineering and Management, 143(06).

Dinca, M S, Barbuta-Misu, N, Madaleno, M, Dinca, G and Deari, F (2017) Integrated Analysis of EU Construction Companies’ Financial Performances. Journal of Construction Engineering and Management, 143(06).

Kwon, N, Park, M, Lee, H, Ahn, J and Kim, S (2017) Construction Noise Prediction Model Based on Case-Based Reasoning in the Preconstruction Phase. Journal of Construction Engineering and Management, 143(06).

Lee, D, Lee, S and Kim, S (2017) Composite Phase-Change Material Mold for Cost-Effective Production of Free-Form Concrete Panels. Journal of Construction Engineering and Management, 143(06).

Li, R and Roberti, R (2017) Optimal Scheduling of Railway Track Possessions in Large-Scale Projects with Multiple Construction Works. Journal of Construction Engineering and Management, 143(06).

Liu, H, Jazayeri, E and Dadi, G B (2017) Establishing the Influence of Owner Practices on Construction Safety in an Operational Excellence Model. Journal of Construction Engineering and Management, 143(06).

Liu, J, Xie, Q, Xia, B and Bridge, A J (2017) Impact of Design Risk on the Performance of Design-Build Projects. Journal of Construction Engineering and Management, 143(06).

Luo, X, Li, H, Dai, F, Cao, D, Yang, X and Guo, H (2017) Hierarchical Bayesian Model of Worker Response to Proximity Warnings of Construction Safety Hazards: Toward Constant Review of Safety Risk Control Measures. Journal of Construction Engineering and Management, 143(06).

Marrana, T C, Silvestre, J D, de Brito, J and Gomes, R (2017) Lifecycle Cost Analysis of Flat Roofs of Buildings. Journal of Construction Engineering and Management, 143(06).

Mohseni, H, Setunge, S, Zhang, G and Wakefield, R (2017) Markov Process for Deterioration Modeling and Asset Management of Community Buildings. Journal of Construction Engineering and Management, 143(06).

Pereira, E, Han, S, AbouRizk, S and Hermann, U (2017) Empirical Testing for Use of Safety Related Measures at the Organizational Level to Assess and Control the On-Site Risk Level. Journal of Construction Engineering and Management, 143(06).

Sullivan, J, Asmar, M E, Chalhoub, J and Obeid, H (2017) Two Decades of Performance Comparisons for Design-Build, Construction Manager at Risk, and Design-Bid-Build: Quantitative Analysis of the State of Knowledge on Project Cost, Schedule, and Quality. Journal of Construction Engineering and Management, 143(06).

Teo, P and Love, P E D (2017) Re-Examining the Association between Quality and Safety Performance in Construction: From Heterogeneous to Homogeneous Datasets. Journal of Construction Engineering and Management, 143(06).

Yeh, H, Hsieh, T and Chen, J (2017) Managing Complex Engineering Interfaces of Urban Mass Rapid Transit Projects. Journal of Construction Engineering and Management, 143(06).

Yuan, C, McClure, T, Cai, H and Dunston, P S (2017) Life-Cycle Approach to Collecting, Managing, and Sharing Transportation Infrastructure Asset Data. Journal of Construction Engineering and Management, 143(06).

Zahoor, H, Chan, A P C, Utama, W P, Gao, R and Memon, S A (2017) Determinants of Safety Climate for Building Projects: SEM-Based Cross-Validation Study. Journal of Construction Engineering and Management, 143(06).

Zhao, Z, Tang, C, Zhang, X and Skitmore, M (2017) Agglomeration and Competitive Position of Contractors in the International Construction Sector. Journal of Construction Engineering and Management, 143(06).